Trusted by over 1.5 million satisfied customers since 2014

Assy, Maxirest (Set Lh/Rh) Deluxe Plastic Rails Long Leadtime - Sold As Pair

$813.50
In stock
Product Code :
MPSGHF-GL927100
ASSY, MAXIREST (SET LH/RH)
Product Code
MPN GL927100
Brand Graham Field
Packaging 1/ea
Delivery: 3 - 5 Days
3030 Days Return

Note : Image shown for reference purposes only. Actual product appearance may vary. Please read product description for full and accurate details.

Features

  • Robust steel two-piece split-frame construction for ease of delivery and transport
  • Bed deck width is expandable from 39 inches (99.06 cm) to 54 inches (137.16 cm)
  • Bed deck length is adjustable from 80 inches (203.20 cm) to 88 inches (223.52 cm)
  • 5 inch Deluxe Caster Set includes 2 Total-Lock and 2 Steer-Lock for ease of maneuverability
  • Standard 3-Function Positioning hand control
  • Optional 5-Function Positioning hand control (Trendelenburg / Reverse Trendelenburg and Chair positioning)
  • Synchronized Hi/Lo Motors ensure bed remains level
  • Battery backup standard for dependability
  • Optional Intuitive side rail system for both head and foot sections
  • Optional laminate wood grain or plastic molded head and foot board options
  • Optional factory-installed weight scale system

Maxi Rest 4054 Series

  • Safe working load: 1,000 lb (453.6 kg)

 

Write Your Own Review
You're reviewing:Assy, Maxirest (Set Lh/Rh) Deluxe Plastic Rails Long Leadtime - Sold As Pair
Your Rating

Disclaimer : No part of this site constitute medical advice or nor it replaces any advice provided by healthcare adviser. We urge buyer to take advice from the designated healthcare adviser about usage of any product here or if it is suitable for the buyer. This site takes no responsibility of the consequences arising out of the usage of any product from this site. By buying products from this site, buyer agree that buyer has the knowledge of the usage of the product. All warranties implied or explicitly mentioned here are responsibility of the manufacturer of the product. We are not able to accept any insurance or Medicaid or Medical for any purchase. Our apologies for that inconvenience.

WARNING: There are products on this website which can expose you to chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.p65warnings.ca.gov.

Copyright © 2026 by medicalproductssupply. All rights reserved. ( A Welleus Global Solutions LLC Company )